Lagging indicator

Severity Rate Calculator

Measure days lost to injury per 100 full-time workers (200,000 hours).

Live calculator

Severity Rate

Severity rate = (Lost workdays × 200,000) ÷ Hours worked

Severity rate

—days / 100 FTE

Enter lost workdays and hours worked.

Severity rate answers a different question from frequency: not “how often are people hurt?” but “how many days of work did those injuries cost?” It is commonly calculated as total days away from work (and sometimes days of restricted duty, depending on your definition) normalised to 200,000 hours.

A low frequency rate with a high severity rate means rare but serious events. That pattern should drive high-potential incident review and critical-control verification, not celebration of a “low AFR”.

Key points

Before you run the numbers, keep these rules of thumb in mind — they prevent the most common reporting mistakes.

  • Publish whether restricted days are included before you trend the metric.
  • Always show severity beside a frequency rate on the same slide.
  • Investigate whether a spike is one long case or many short absences.
  • State fatality day-charging rules if fatalities are folded into severity.

Formula

Severity rate answers how many days of work injuries cost, normalised per 100 full-time equivalent workers. It complements frequency rates that only count how often people are hurt.

Formula. Severity rate = (Total lost workdays × 200,000) ÷ Hours worked

Used by safety managers reporting OSHA-style severity alongside TRIR / DART.

Variables explained

Each term in the equation must use the same reporting period and workforce boundary.

Symbol / inputWhat to enter
Lost workdaysDays away (and restricted days if your definition includes them) charged to injuries in the period.
Hours workedSame exposure hours used for TRIR / LTCR in that period.
200,000100 employees × 2,000 hours/year — the OSHA-style base.

How to use this calculator

Sum days under a single written rule, match the hours, then present severity next to frequency — never alone.

1. Sum lost workdays

Total calendar or scheduled workdays charged to injuries in the period under your corporate rule (OSHA days away, or days away + restricted).

  • Cap rules — if any — must match your published definition.
  • Update open cases when people return to work.

2. Enter hours worked

Use the same employee (and contractor, if in scope) hours as your frequency rates for that period.

3. Report beside frequency

Always present severity rate next to TRIR, LTIFR or AFR so leaders see both how often and how badly.

Interpreting the result

Severity is a days metric. Read it with case rates so one long absence does not hide a cluster of shorter events — or the reverse.

Severity vs related case metrics
MetricCountsTypical base
Severity rateDays lost200,000 hours
Lost time case rateCases with days away200,000 hours
DARTDays away / restricted / transfer cases200,000 hours
LTIFRLost-time injury cases1,000,000 hours

OSHA context

The 200,000 multiplier equates to 100 employees working 2,000 hours/year. It makes small and large sites comparable on a per-100-FTE basis.

Watch for under-counting

Early return-to-work programmes reduce days away — good for people and for the rate — but do not hide restricted-duty burden if your severity definition excludes it. Be transparent in the notes.

Worked example

A plant closes the year with 40 lost workdays and 180,000 hours worked.

  1. Lost workdays = 40
  2. Hours = 180,000
  3. Severity rate = (40 × 200,000) ÷ 180,000 = 44.4

Report as 44.4 days per 100 FTE, with a note on whether restricted days were included.

Input / resultValue
Lost workdays40
Hours worked180,000
Severity rate44.4 days / 100 FTE

Frequently asked questions

Align these answers with your recordkeeping procedure before the next board pack.

What is a good severity rate?

Targets are sector-specific. Trend your own sites on a rolling 12 months and investigate spikes driven by a single long-duration case versus a cluster of shorter absences.

Does severity rate include fatalities?

Practices differ. Some systems charge a set number of days for a fatality; others report fatalities separately and keep severity as days-away only. State your rule in the KPI definition.

Severity rate vs DART?

DART is a cases rate (days away, restricted or transfer cases per 200,000 hours). Severity rate is usually a days rate. They complement each other.

Disclaimer. These calculators support training and internal KPI arithmetic. They are not legal advice, medical advice, or a substitute for your organisation's procedures, applicable standards, or a competent person's judgement. Confirm definitions and multipliers against your SMS and the code of record before reporting externally.

Related tools

Use these calculators alongside this one when you need a fuller safety-performance picture.

Browse all free OSHE calculators