ByWilliam Reed

Risk Assessment Template: What to Include and How to Fill One In

A risk assessment template turns a workplace walk into a written record: one row per hazard, with who could be harmed, the risk score, and the further action with a named owner and a date.

Table of contents12 sections · 31 subsections

A risk assessment template is a blank form that turns a workplace walk into a written record. One row covers one hazard. It names who could be harmed, what already protects them, and the risk score. It also records the further action, with a named owner and a date.

A good template forces the same questions for every hazard. Nothing is scored on a gut feeling, and no action is left without someone responsible for it. The test is simple. A stranger should be able to read the finished form and know exactly what is dangerous, what is already done about it, and what still needs doing.

What a Risk Assessment Template Is

Four pastel cards compare a blank template form, a worker assessing risks, a risk register log, and a one-row-per-hazard table.

A risk assessment template is a structured form for recording a risk assessment. One row covers one hazard. Its columns record who might be harmed and how, the controls already in place, a risk score, and the further action with a named owner and a due date. It gives every hazard the same set of fields, so two assessors working in different departments produce records that can be compared.

Without a template, one person writes a paragraph and another writes a list. Nobody can tell which risks are the worst. The form itself does not make the workplace safe; the thinking that fills it in does.

A template is not the same as a risk assessment. The assessment is the process. Walking the workplace, talking to the people who do the work, judging the risks and choosing controls. The template is the record of that process. It is also not a risk register. A register is a living log that tracks risks over months, with status changes and review dates. A template captures one assessment at one point in time, and the finished copy can then be moved into a register for tracking.

Most templates share the same shape, whether they cover a warehouse, an office or a construction site. A header block names the activity, the assessor and the date. A table carries one row per hazard. A scoring scale turns judgement into numbers. A sign-off block records who approved the assessment and when it must be reviewed. The sections below take each part in turn, with what to write in it.

Tip

Keep the template short enough to read in five minutes. A form that takes an hour to read will not be read, and a record nobody reads protects nobody.

The Header: What Goes at the Top of the Form

Three cards show a site electrician's activity and scope, an assessor signing with date and version, and a review calendar with triggers.

The header is the part of the template that proves when, where and by whom the assessment was done. Without it, a filled-in form is an orphan. Nobody knows which workplace it covers, which job it describes, or whether it is still current. Every header needs the same six fields, and each one earns its place.

Activity, Location and Scope

Name the activity or area the assessment covers, in words a new starter would understand. "Warehouse receiving, ground floor" is a scope; "warehouse" is not. A scope that is too wide produces a form with fifty rows that nobody finishes, while a scope that is too narrow leaves hazards outside the frame. One assessment per activity or area is the usual rule, with specialist assessments linked rather than crammed in.

Write the location with enough detail to find it: building, floor, room or yard. Add the task or process where the hazards live, such as "unloading deliveries by forklift" or "solvent parts washing". If the assessment covers a whole site, say so, and note which areas were walked and which were not. A reader should be able to tell what was assessed without asking the assessor.

Assessor, Date and Version

Record the name of the person who carried out the assessment and the date it was done. The assessor must know the work. The UK Health and Safety Executive (HSE) says an assessment can be done by the employer or by a competent person appointed to help. The person who writes it must know the work as it is really done. A manager who has never walked the floor will miss hazards that the people doing the job see every day.

Add a version number and a date to every copy. Assessments change: a new machine arrives, a control fails, a near miss reveals a gap. A version number stops two different copies circulating at once. It lets a reviewer see at a glance whether the copy on the wall is the current one. Mark superseded copies clearly, and keep the old version on file rather than deleting it.

Review Date

Set the next review date when the assessment is signed off, not when someone remembers to check. Once a year is a common interval for a stable workplace, and sooner for high-risk work. The date belongs in the header so it is visible every time the form is opened, not buried in a diary that only one person sees.

Write the review triggers beside the date: a change in staff, process, substances or equipment. An accident or a near miss. A worker reporting a problem with a control. HSE lists the same triggers on its five steps page, and the point is the same: a review date is a backstop, not a reason to wait. If something changes tomorrow, the assessment is reviewed tomorrow.

The Columns Every Template Needs

A numbered list of twelve pastel rows names every template column, from hazard and who is harmed to residual risk and next review.

The table is the heart of the template, and its columns are the questions every hazard must answer. Twelve columns cover the full job for a workplace assessment. Fewer columns leave gaps — usually the owner, the date or the residual risk — and more columns turn the form into a chore that assessors rush through. The table below lists each column with what goes in it. The subsections that follow explain the five columns people get wrong most often.

ColumnWhat to write
HazardWhat could cause harm, and where it is
Who might be harmed and howThe people affected and the harm they could suffer
Existing controlsWhat is already protecting people today
Likelihood (1–5)How likely harm is, with the controls in place
Severity (1–5)How serious the harm would be
Risk scoreLikelihood times severity, 1 to 25
Further actionWhat else must be done
OwnerThe named person responsible for the action
Due dateWhen the action must be done by
Residual riskThe score after the further action
StatusOpen, in progress or closed
Next reviewWhen this row is checked again

Two columns deserve a note before the detail. A risk ID is a short reference number, such as W-01. It keeps rows findable when a form grows past twenty hazards, and it lets a review log point at a single row. A category column (manual handling, electricity, chemicals, work at height) helps a reviewer spot patterns, such as five rows that all point at the same unguarded machine. Neither column is essential for a small assessment, but both repay their space on a large one.

Write the Hazard Specifically

A hazard column fails when it names a place instead of a danger. "Warehouse" is not a hazard. "Forklifts and pedestrians share the same aisle, with no marked walkway" is a hazard, because it says what could cause harm and where. The test is whether a reader who has never visited the site can picture the danger from the words alone. If they cannot, the entry is too vague to score or control.

One row holds one hazard. A row that reads "slips, trips, electricity and chemicals" cannot be scored, because the likelihood and severity differ for each danger, and the controls differ too. Splitting the row takes a minute and saves the confusion later, when an action is assigned to a row that covers four different problems. Where a hazard appears in several places, give it a row per place if the controls differ.

Name WHO Might Be Harmed and How

Name the people and the harm in the same cell, as a short sentence. "Pickers crossing the yard: struck by a reversing forklift" tells the next reader exactly what to prevent. "Warehouse staff" does not. Start with the people doing the job, then work outward. Maintenance staff, cleaners, contractors, drivers, visitors and members of the public. A hazard that only affects a trained operator is different from one that reaches a visitor with no training and no protective equipment.

Some people need extra thought, and the template should make room for them. Young workers may not recognise a danger they have never met. New and expectant mothers face risks that do not apply to others. People with disabilities may need a different escape route. Workers who do not read the site's main language may miss a written warning. Lone and night workers may have nobody nearby when something goes wrong. HSE's guidance names the same groups. A template that ignores them will miss the people most likely to be hurt.

Warning

Never write "everyone" in the who column. A hazard that threatens everyone in general threatens no one in particular, and the control will be just as vague as the entry.

Existing Controls Are Not Further Actions

The existing-controls column records what is already protecting people today. The risk score reflects the workplace as it is, not as it was before any controls existed. A guard fitted last year, a speed limit already signed, a ventilation system already running — all of these belong here. Score the risk with these controls in place. Scoring without them inflates every risk and hides the ones that genuinely need more work.

Further action is a separate column for a reason: it holds what still needs doing. The two columns answer different questions, and mixing them up is the most common error on a filled-in form. "Fit a guard" is a further action, not an existing control. Writing it in the wrong column makes the risk look controlled when it is not. When a control exists only on paper, write it as a further action to fix. A procedure nobody follows and a guard that is always removed are not controls already in place.

Owner and Due Date

Every further action needs a named person and a date, in the same row. A team name is not an owner: "maintenance" owns nothing, while "J. Ahmed, maintenance supervisor" owns something. The owner is the person who makes sure the action happens, not necessarily the person who does the work. If the owner leaves, the row must be re-assigned, not left to drift.

A due date must be a real date, not "soon" or "ongoing". An action without a date will not happen, because nothing distinguishes it from the hundred other things that also need doing. Set the date by the risk. Days for a very high risk, weeks for a high risk, and a planned date for anything lower. When the date passes with the action undone, the row goes back to the top of the review list.

Residual Risk Shows Whether the Action is Enough

Residual risk is the score after the further action is in place, and it is the column that proves the action is worth doing. Score the row twice: once with the controls already in place, and once after the new controls. If the score barely moves, the action is the wrong action, and a different control is needed. A walkway marking that drops a forklift risk from 15 to 5 has done its job. A sign that drops it from 15 to 14 has not.

A residual score that is still high is not a failure of the template; it is information. Some risks cannot be driven low. A worker under a raised vehicle will always face a severe outcome if the lift fails, so the residual score stays medium even with daily checks and annual examination. The template records that honestly, and the controls around it — inspection, training, exclusion zones — become the real protection. Never fudge a residual score down to make a row look closed.

How to Score Risk in the Template

A five-by-five risk matrix in green to red shows likelihood times severity scores from 1 to 25 with four colour-coded risk bands.

Most workplace templates score risk with a 5 by 5 matrix. Likelihood from 1 to 5, severity from 1 to 5, multiplied to give a score from 1 to 25. The score does not make the decision for you. It tells you which risks to deal with first, and it lets two assessors compare their judgement on the same scale. Agree the scales before anyone rates a risk, then keep them fixed, so a score means the same thing in every row and every assessment.

Likelihood \ Severity1 Minor2 Moderate3 Serious4 Major5 Fatal
1 Rare12345
2 Unlikely246810
3 Possible3691215
4 Likely48121620
5 Almost certain510152025

Read the score in bands. 1 to 4 is low, 5 to 9 is medium, 10 to 16 is high, and 17 to 25 is very high. Deal with very high risks first, then high ones. A score of 25 means someone is likely to be killed or seriously hurt, so the work stops until a control is in place. The bands are a guide for ordering work, not a legal threshold. The law asks for everything reasonably practicable. That means balancing the risk against the money, time and trouble of the control.

Alert

Scores are ordered labels, not measurements. A score of 16 is not twice as risky as a score of 8. Use the score to sort risks and start a discussion, never as a precise probability.

The Likelihood Scale

Likelihood answers one question: how often could this harm happen, with the controls already in place? Rate it from 1 (rare) to 5 (almost certain). Anchor each number to something observable, so two assessors reach the same number. A useful anchor set:

  • 1 — Rare: no history here or in comparable work.
  • 2 — Unlikely: it has happened once in comparable work.
  • 3 — Possible: it has happened several times, or one warning sign is present.
  • 4 — Likely: two or more warning signs are present.
  • 5 — Almost certain: it is already happening, or expected before the next review.

Base the rating on evidence, not fear. Accident and near-miss records, maintenance logs and the experience of the people doing the job all count as evidence. A hazard that has caused three near misses this year is not a 2, however unlikely it feels. Where no records exist, ask the workers. They know how often a guard is bypassed, a spill appears, or a shortcut is taken. Their answers will set the likelihood more honestly than any guess from the office.

The Severity Scale

Severity answers a different question: if the harm happens, how bad will it be? Rate it from 1 (minor) to 5 (fatal), and anchor it to real outcomes. A workable set:

  • 1 — Minor: first aid only.
  • 2 — Moderate: minor injury or a few days off work.
  • 3 — Serious: injury needing medical treatment.
  • 4 — Major: serious injury or long-term ill health.
  • 5 — Fatal: death or life-changing injury.

The Canadian Centre for Occupational Health and Safety uses the same shape in its sample risk assessment form, with high severity covering fatal injury, permanent disability and major fracture.

Score the worst realistic outcome, not the worst imaginable one. A dropped spanner from a scaffold could kill someone in theory. If the area below is fenced and nobody works there, the realistic severity is lower. Equally, do not score the outcome you hope for. A fall from a ladder onto concrete is a serious injury, even if the last person to fall walked away. When the outcome is genuinely uncertain, score the higher number and say why in the notes.

Read the Score in Bands, and Act on the Band

Each band carries a response, and writing the response into the template stops arguments about what a score means. Low risks (1 to 4) are managed with the existing controls and checked at the next review. Medium risks (5 to 9) get a proportionate action with a planned date. High risks (10 to 16) get action within weeks, with weekly checks until the residual score drops. Very high risks (17 to 25) stop the work or get action before the work continues, with the accountable person told within days.

One special rule protects against a blind spot in the maths. A hazard with a severity of 5 — death or life-changing injury — should never sit in the low band just because it is rare. A score of 1 times 5 is 5, which reads as medium. A score of 2 times 5 is 10, which reads as high. The bands already push severe outcomes upward.

Some templates go further and treat any severity of 5 as at least high, whatever the likelihood. Either approach works, as long as the rule is written on the template and applied every time.

Score Twice: Before and After Controls

Every row needs two scores. The risk with the controls already in place, and the residual risk after the further action. The gap between them is the value of the action. A control that moves a score from 12 to 4 is doing real work. A control that moves it from 12 to 10 is not. The template should force a rethink rather than a tick in a box.

Score the residual honestly, and never let it fall below what the controls can actually deliver. Training does not change the severity of a fall, only its likelihood. A guard changes the likelihood of contact, not the severity of the machine. When a further action cannot move the score at all, write that down and say why, then look for a stronger control higher up the hierarchy of controls. A template that records a stubborn residual score is telling the truth; one that hides it is not.

When a 3 by 3 Matrix is Enough

A 5 by 5 matrix is the common choice, but it is not the only one. A 3 by 3 matrix — low, medium and high for both likelihood and severity — suits a small, low-risk workplace where the assessor knows every job and the hazards are familiar. The Canadian Centre for Occupational Health and Safety publishes a 3 by 3 sample form, with probability anchored to time. High means likely once a year or more. Medium means once every five years. Low means once in a working lifetime.

Choose the scale by the size and risk of the workplace, not by fashion. A 5 by 5 matrix gives finer distinctions, which helps when a site has dozens of rows and the order matters. A 3 by 3 matrix is faster and harder to argue over, which helps when the assessor is a busy supervisor with ten rows to fill in.

Whichever scale the template uses, print the scale definitions on the form itself, so nobody has to remember what a 3 means. For risk management beyond one assessment, ISO 31000:2018 gives principles and guidelines for identifying, analysing, evaluating, treating, monitoring and communicating risks. It is guidance, not a certifiable standard.

How to Fill in a Risk Assessment Template, Step by Step

Six numbered step cards show the fill-in sequence: walk the work, list hazards, score rows, choose controls, owner and date, sign off.

Filling in a template is a short job when it follows the same order every time. The six steps below take a blank form to a signed-off record. The method behind them is the five-step risk assessment process, which follows the sequence the UK Health and Safety Executive sets out in its five steps for managing risk. It scores risk on the same 1 to 5 matrix used here. Work through the steps in order, and do not skip ahead: each step depends on the one before it.

Step 1: Walk the Work as It is Really Done

Four numbered panels with arrows show step one: walk the floor, watch the real work, talk to workers, and check records.

Start by walking the area and watching the work happen, before writing anything in the template. Stand where the worker stands and follow the job from start to finish, including the awkward parts: reaching, lifting, waiting, clearing up. Hazards hide in the steps people rush, the shortcuts they take when they are short of time, and the tasks that happen only once a month. Note how people actually work, not how the procedure says they should work, because the gap between the two is where most harm hides.

Talk to the workers while walking. They know where the problems are. The guard that is always in the way, the floor that is always wet after rain, the chemical that always splashes. Their answers will name hazards that no checklist contains. Look back at accident and ill-health records, including near misses, and check manufacturers' instructions and safety data sheets for equipment and chemicals. The US Occupational Safety and Health Administration (OSHA) makes the same point in its hazard identification guidance: collect existing information first, then inspect, then investigate incidents and near misses.

Step 2: List Every Hazard Before You Score Anything

A split flow shows a hazard checklist on the left and scoring on the right, joined by a THEN arrow: list first, score second.

Fill in the hazard column and the who column for every row before scoring a single one. Write each hazard specifically, name who could be harmed and how, and note the existing controls. A complete list first, scores second. Scoring while listing pushes the list toward the risks already feared. It hides the quiet ones, such as long-term health hazards from dust, noise or manual handling that never cause a dramatic incident.

Include routine work and non-routine work: maintenance, cleaning, deliveries, changes in production and emergency situations. OSHA's guidance asks assessors to consider hazards from emergency and non-routine situations, and HSE asks for the same attention to maintenance and cleaning. Fires, chemical releases and medical emergencies each need written practice emergency procedures that the assessment must reflect. A hazard found after the scores are set is easy to miss entirely, so take the time to finish the list. When the list feels complete, read it back with the workers who do the job and ask what is missing.

Step 3: Score Each Row

Three panels show likelihood from one to five, severity from one to five, and the score as likelihood times severity, one to twenty-five.

Work down the table and score each row with the controls already in place. Rate likelihood from 1 to 5 using the anchored scale on the form, rate severity from 1 to 5 the same way. Multiply them for the risk score. Write the score in the row, not in your head. Write a short note where the score is a judgement call, such as "likelihood 3 — two near misses this year". A note lets the next reviewer see the reasoning instead of guessing at it.

Score each row on its own merits, and do not let one high score push the others up or down. A row that scores 4 is not a failure; it is a risk the existing controls already handle. When two assessors disagree on a score, do not split the difference. Look at the evidence together: the records, the incident log, and the workers' experience. Then agree the number from the evidence. If the evidence is thin, score the higher number and write down what would settle it.

Step 4: Choose Controls from the Top Down

A five-level pyramid ranks controls from most to least effective: eliminate, substitute, engineering, administrative, and PPE last.

For each row that needs more than the existing controls, choose the further action from the top of the hierarchy of controls, not the bottom. Work down the list and stop at the highest control that works:

  1. Eliminate the hazard.
  2. Substitute something safer.
  3. Isolate people from it with engineering.
  4. Change how the work is done.
  5. Use personal protective equipment (PPE) last.

A control lower down the list is only acceptable when the higher ones cannot be used.

Write the control as a concrete action, with enough detail to do it. Say "fit a fixed guard to the parts washer" rather than "improve safety". Say "mark a pedestrian walkway with barriers at the aisle ends" rather than "separate people and vehicles". Then score the residual risk with that control in place. If the residual score barely moves, the control is too weak, and the row needs a stronger answer. A template that accepts a weak control for a high risk has not controlled the risk. It has only dressed for it.

Step 5: Give Every Action an Owner and a Date

Three panels with arrows show a named person for every action, a real calendar date, and telling the team where the work happens.

Go through the further-action column and give every action a named owner and a due date. One person per action, named in full, with a date that matches the risk band. Days for very high risks, weeks for high risks. A planned date for anything lower. An action with no owner and no date will not happen. A row that cannot be assigned is not finished — it is waiting for a decision about who owns it.

Tell the people affected what changed and what they must do differently. A control that nobody knows about protects nobody. A worker who was not told about a new rule cannot be expected to follow it. Share the finished assessment with the team, keep a copy where the work happens rather than only in the office, and note who has read it. The record should be short enough to read in five minutes and clear enough that a new starter understands what to do.

Step 6: Sign It Off and Set the Review

Three panels with arrows show the assessor signing, the manager countersigning, and the review date set with its triggers.

Sign the assessment off when every row has a score, every action has an owner and a date, and the residual risks are honest. The assessor signs, and a manager or supervisor countersigns to show the actions have the authority and the resources behind them. The Canadian Centre for Occupational Health and Safety sample form carries two signature blocks. The assessor, and the health and safety committee or representative. The same idea applies here. A signature means someone has read the assessment and stands behind it.

Set the review date in the header before filing the form, and write the review triggers beside it. A review is a short check, not a new assessment from scratch, unless the change is big enough to need one. When the review follows an incident, a fishbone diagram maps the causes behind the miss, and a root cause analysis finds out why it was missed. When the review finds nothing to change, write that down too, with the date. A record that shows regular reviews is worth more than one that shows a single assessment from three years ago.

Alert

A signed assessment is not a guarantee that nobody will be hurt. It is a record that the risks were thought through, the controls were chosen, and the actions were assigned. The protection comes from doing the actions, not from the signature.

A Worked Example: Three Filled-In Rows

A three-row table for a repair shop shows a vehicle lift, a solvent parts washer and manual handling with scores and residual ratings.

The table below shows three rows as they might look for a small motor vehicle repair shop, filled in the way the sections above describe. The shop has two mechanics, one ramp, and a solvent parts washer. Each row names the hazard specifically, scores the risk with the controls already in place, and then scores it again after the further action. Read the rows in order. The pattern is the same for any workplace, and the numbers use the 5 by 5 matrix from the scoring section.

HazardWho might be harmed and howExisting controlsScoreFurther actionOwner / DueResidual
Vehicle falls from the two-post lift while a mechanic works underneathMechanic under the vehicle: crush injury or deathLift inspected annually; locking arms engaged before work2 × 5 = 10 HighDaily pre-use check of locks and arms; wheel chocks fitted; no work under a vehicle held only by a jackR. Patel, workshop manager / 30 Nov 20261 × 5 = 5 Medium
Solvent parts washer: skin contact and vapour inhalationMechanic cleaning parts: dermatitis and breathing irritationLid kept closed when not in use; safety data sheet on file3 × 3 = 9 MediumNitrile gloves and eye protection at the washer; local exhaust ventilation checked monthly; less hazardous solvent trialledS. Okafor, senior mechanic / 15 Dec 20262 × 3 = 6 Medium
Manual handling of wheels and tyres, up to 20 kg eachMechanics lifting wheels: back and shoulder strainTyre trolley available; lifting training completed4 × 2 = 8 MediumTwo-person lift for wheels above 20 kg; heavy stock moved to waist-height rackingR. Patel, workshop manager / 30 Nov 20262 × 2 = 4 Low

Three things are worth noticing in the example. First, the residual score for the lift stays medium, because the severity of a falling vehicle cannot be reduced — only its likelihood can. Second, the parts washer row scores the further action honestly. Gloves and ventilation reduce the risk, but the solvent is still there, so the residual stays medium. Third, every action has a named owner and a real date. The dates fall inside the bands the template sets for high and medium risks.

The example also shows what a template leaves out. It does not cover the specialist assessments the shop needs alongside it. A fire risk assessment covers the fuel and oil store. A Control of Substances Hazardous to Health (COSHH) assessment covers the solvent itself. Those get their own forms, linked from the main assessment rather than squeezed into it. A template that tries to cover everything ends up covering nothing well.

Choosing a Template: Free, Ready-Made or Your Own

Four pastel cards compare the HSE free template, spreadsheet or paper, adapting a generic template, and specialist fire and COSHH templates.

Most workplaces do not need to design a template from a blank page. Good templates already exist, and the right choice depends on the size of the workplace and the risks in it. The sections below cover the free starting points, the format question, how to adapt a generic template, and the point at which a specialist template is needed instead.

The HSE Free Template

The UK Health and Safety Executive publishes a free risk assessment template in Word and OpenDocument formats. Six filled-in example assessments sit beside it:

  • An office-based business.
  • A local shop or newsagent.
  • Food preparation and service.
  • A motor vehicle repair shop.
  • Factory maintenance work.
  • A warehouse.

The template follows the five steps exactly. Each row records the hazard, who might be harmed and how, and what is already being done. It also records the further action, who must carry it out, and when it is needed by. It is the best starting point for a small, low-risk workplace, and it costs nothing.

HSE's warning about its examples applies to every free template. Do not copy an example and put a company name on it. That would not satisfy the law, and it would not protect employees. An example shows the level of detail expected. The finished assessment must describe the hazards and controls of the workplace it covers. Use the HSE template as a frame, then delete the rows that do not apply and add the ones that do.

Spreadsheet or Paper

A spreadsheet suits an assessment with many rows, because it calculates the scores, sorts the rows by risk, and filters the open actions by owner or date. A paper form suits a small assessment that is filled in on the shop floor, where a clipboard works and a laptop does not. The choice is practical, not moral. Pick the format the assessor will actually use, and keep one master copy so two versions do not circulate.

Whatever the format, keep the form printable on one or two pages per assessment, with the matrix and the scale definitions on the same pages. A spreadsheet with twenty columns that only makes sense on a wide screen will be printed badly, folded, and ignored. If the template needs a second page, put the review log there. A short table of review dates, what changed, and who reviewed it. The log turns a single assessment into a record of how the risks were managed over time.

Adapt a Generic Template Before Using It

A generic template is a starting point, not a finished document. Before using one, delete every row and column that does not apply, and add the hazards that do. A warehouse template used in an office keeps rows about forklifts that nobody will ever fill in, and an office template used in a warehouse misses the forklifts entirely. Both failures come from the same cause: the template was used as found, instead of being adapted.

Adaptation also means fixing the language. Replace generic labels with the names used on site: the actual machine, the actual chemical, the actual room. Add a column where the work needs one — a task column for a job hazard analysis, a category column for a large site, a cost column where a manager must approve spending. Remove a column where it adds nothing. A residual-risk column is essential, while a risk ID column may not be, on a ten-row form. The template serves the assessment, not the other way round.

When a Specialist Template is Needed

Some hazards need a template of their own, because the generic columns cannot hold the detail. Fire needs its own assessment, with ignition sources, fuel, escape routes and alarm testing. Hazardous substances need a COSHH assessment, with exposure limits and health surveillance. Manual handling needs its own form, with weights, distances and postures. Display screen equipment needs one too, with workstation checks and eye tests. First aid provision needs its own assessment as well: the contents of the first aid kit follow from the hazards and the numbers on site, not from a generic list.

The rule is simple. When a hazard is governed by its own regulations or needs its own method, give it its own template. Link it from the main assessment. Note the specialist assessment in the main form, with its date and its owner, so a reader can find it. The main template stays short and readable, and the specialist detail lives where it belongs. Trying to fit a fire assessment into a generic row is how both documents end up useless.

Tip

Start from the HSE template even when the workplace is large. A proven frame with the right columns beats a clever custom design that misses the owner column or the residual score.

Common Mistakes That Weaken a Template

Ten red-crossed rows list the mistakes that weaken a template, from copied forms and vague hazards to PPE-only fixes and no review.

Most weak templates fail in the same few ways, and each one is easy to spot before signing off. The list below covers the mistakes that turn up most often, with the fix for each one. Fix them in the draft, not after an incident.

  • Copied from another workplace. The hazards, the people and the controls are different; start from a walk of the workplace that the form covers.
  • Hazards written as places, not dangers. "Warehouse" cannot be scored; write what could cause harm and where it is.
  • Scores given before the list is finished. List every hazard first, then score, so the quiet risks are not crowded out by the obvious ones.
  • Existing controls and further actions mixed up. A control that does not exist yet belongs in the further-action column, not the existing-controls column.
  • Actions with no owner and no date. Name a person and a date for every further action, or leave the action out and say why.
  • PPE as the only control. Work down the hierarchy of controls; PPE is the last resort, not the first answer.
  • Residual risk fudged down. Score the risk after the action honestly; a stubborn residual score is information, not a failure.
  • Never reviewed. Set a review date and review triggers when the form is signed off, and write the review down when it happens.
  • Too long to read. If the record takes more than five minutes to read, cut it to the significant findings and move the detail to the specialist assessments.
  • Filled in by someone who never does the job. Involve the workers; they see hazards the office misses, and they have to live with the controls.

Checklist: Before You Sign Off a Risk Assessment Template

A clipboard checklist with eight green ticks covers the header, hazards, controls, scoring, owners, residual risk and signatures.

Run through the list below before signing a template off. Every item should be a yes; a no means the assessment is not ready.

  • Header complete: activity, location, scope, assessor, date, version and next review date.
  • Every hazard found on a walk of the real workplace, including non-routine work.
  • Every hazard names who could be harmed and how, in a sentence a stranger can picture.
  • Existing controls recorded as they are today, not as they should be.
  • Every risk scored with the same matrix and the same anchored scales.
  • Further actions chosen from the top of the hierarchy of controls, not PPE alone.
  • Every further action has a named owner and a real due date.
  • Residual risk scored honestly for every row that has a further action.
  • Specialist assessments linked, not squeezed into the generic rows.
  • Workers who do the job have read it and agree with it.
  • Review date and review triggers written in the header.
  • Sign-off block signed by the assessor and countersigned by a manager.

Frequently Asked Questions

What is a Risk Assessment Template?

A risk assessment template is a blank form for recording a risk assessment. One row per hazard, with columns for who might be harmed and how, the controls already in place, a risk score. The further action with a named owner and a due date. It forces the same questions for every hazard, so the finished record can be compared, reviewed and acted on.

What Should a Risk Assessment Template Include?

At minimum, a header with the activity, location, assessor, date and review date. A table with columns for the hazard, who might be harmed and how, existing controls, likelihood and severity scores, further action, owner, due date and residual risk. A sign-off block completes the form. A risk ID, a category column and a review log are useful additions on larger assessments.

How Do You Fill in a Risk Assessment Template?

Walk the workplace and talk to the workers. List every hazard before scoring any of them. Score each row with the controls already in place. Choose further controls from the top of the hierarchy of controls. Give every action a named owner and a due date. Then sign the form off and set the review date. The finished form should be short enough to read in five minutes.

What is the Difference Between a Risk Assessment Template and a Risk Register?

A template captures one assessment at one point in time. A risk register is a living log that tracks risks over months, with status changes, review dates and response plans. A finished template can be moved into a register for tracking. The two documents have different jobs: the template diagnoses, and the register monitors.

Where Can I Get a Free Risk Assessment Template?

The UK Health and Safety Executive publishes a free template in Word and OpenDocument formats, with six filled-in example assessments for an office, a shop, food preparation, a motor vehicle repair shop, factory maintenance and a warehouse. Use it as a frame, then delete the rows that do not apply and add the hazards that do. Copying an example unchanged does not satisfy the law.

How Often Should a Risk Assessment Template Be Reviewed?

At least once a year in a stable workplace, and sooner for high-risk work. Review it at once after any change in staff, process, substances or equipment, after an accident or near miss, and whenever a worker reports a problem with a control. Write the review down, even when nothing changes.

Do I Need a Risk Assessment Template If I Have Fewer Than Five Employees?

In the UK, the duty to assess risks applies at any size under the Management of Health and Safety at Work Regulations 1999. The only difference is that workplaces with fewer than five employees are not required to write the significant findings down. Keeping a short written record is still good practice, because it proves the thinking happened.

What is a Risk Assessment Matrix?

A grid that scores risk as likelihood times severity, each rated from 1 to 5 on a 5 by 5 matrix, giving a score from 1 to 25. The score is read in bands. 1 to 4 is low, 5 to 9 is medium, 10 to 16 is high. 17 to 25 is very high. A simpler 3 by 3 matrix, with low, medium and high on each side, suits a small, low-risk workplace.

Sources